Consented Sites

Land with Planning

Land with planning consent is where value is created. But consented sites attract competition, and speed matters. We arrange bridging finance that lets you move decisively — securing the site while you prepare to build or sell.

Today’s rates and costs 158 lenders active in the market Every fee in writing before you commit
Discuss your deal Always confidential. No obligation.

£200k–£100m+

Loan Size

12 to 24 months

Typical Term

some lenders go to 36 months

Up to 70% LTV

Typical LTV

Key Features

What We Offer

Higher leverage with consent in place

Planning permission significantly increases land value, meaning lenders offer better LTVs and rates.

Flexible terms aligned to build start

We structure terms that give you time to mobilise contractors and prepare for development.

Exit to development finance or sale

Whether you plan to build or sell with planning, we ensure the exit strategy is rock solid.

Cross-charge options available

Use equity in other assets to boost leverage on the land purchase.

Outline and full planning considered

Whether you have full detailed consent or outline permission, we have lenders for both.

Fast completion to beat competing buyers

Land with planning attracts competition. Speed of funding is often the decisive factor.

Ideal For

Common Scenarios

Ready-to-Build Site

Full planning consent in place, you need to acquire the site quickly before another developer moves. Speed is everything.

Land with Outline Planning

Outline planning permission granted, with reserved matters still to be approved. We find lenders comfortable at this stage.

Land Bank Acquisition

Building a portfolio of consented sites for future development. We fund strategic acquisitions.

Planning Gain Play

Buy land with consent and sell to a developer or housebuilder at a significant uplift. We fund the hold period.

Typical Costs

What You'll Pay

Every deal is different, but here's what to budget for on a typical land with planning facility. Use our calculator to estimate total costs for your specific deal.

Interest Rate

Priced case by case, rolled up.

Arrangement Fee

1–2% of the gross loan.

Valuation Fee

£500–£3,000+ depending on the site. Paid directly to the surveyor.

Legal Fees

Your solicitor + lender's solicitor. Budget £1,500–£5,000+ for each side.

Exit Fee

0–1% of the loan. Many lenders charge none.

Our Fee

Our fee is generally 1% of the gross loan, paid on completion.

How It Works

From Enquiry to Completion

01

Review the Site and Planning Consent

We assess the site, its location, the planning consent granted, any conditions or reserved matters, and the development potential. The nature of the consent – full detailed permission versus outline – directly impacts the leverage and rates available. We also review any Section 106 obligations or CIL liabilities attached to the consent.

02

Source Terms from Land-Specialist Lenders

Consented land attracts significantly better terms than unplanned sites. We approach lenders active in the market who specialise in land with planning, securing indicative terms within 4 hours on straightforward deals, often quicker. For time-sensitive acquisitions, we can instruct valuations and legal work in parallel to compress the timeline.

03

Complete and Secure the Site

Once the valuation confirms the consented land value and legals are satisfied, funds are drawn down and you complete the purchase. From there, you either progress directly into a development finance facility to fund the build, or hold the site and sell with consent to a developer at the planning uplift.

Valuation

How Lenders Value Land with Planning: the Residual Method

A land lender lends against what the site is worth to a buyer who would build the consented scheme: the finished value, less the cost of building it and a developer’s profit. That figure, the residual land value, is the security.

The sum

Gross development value (GDV), less build costs, less professional fees, finance and sales costs, less Section 106 and CIL, less the developer’s profit, equals the residual land value. Valuers then check the answer against sales of comparable sites, so the residual is one test rather than the only one.

Why contingency cuts your security

Every pound added to costs comes off the residual, pound for pound. A development lender likes contingency because it protects the build; a land lender sees the same line as a lower land value. Both are right about different loans. So don’t pad the cost plan: evidence it.

How to evidence firmer costs

Contractor quotes or a tender return, the procurement route, a QS cost plan, and proof of work already done on site (services, drainage, utilities). Brief the cost surveyor on what is already done and procured before they report, so the figures reflect where the site really is.

“What would a buyer who stepped in see?”

The valuer is valuing the site for any willing buyer, who would apply their own costs and profit. If your figures only work for you, expect the valuer to say so. Strengthen the evidence, not the adjectives.

Can I talk to the valuer?

The valuer is instructed by, and reports to, the lender, and has to stay independent. Send information through the lender or through us, and ask early what evidence the valuer wants to see. If you plan to build the scheme yourself, our development finance page covers the next stage.

Worked example: what contingency does to a land loan

Illustrative example. The figures are invented to show the mechanics. This is not a real site, not a valuation and not an offer of terms.

A site has consent for a residential scheme with a GDV of £20.0m. GDV £20.0m, less build £10.0m, less fees, finance, sales costs and S106/CIL of £2.0m, less a developer’s profit of £4.0m (20% of GDV, an assumption for the example) leaves a residual land value of £4.0m.

  • As costed: a £2.5m bridge is 62.5% of £4.0m, inside the “up to 70%” on this page.
  • Add 5% contingency to the build (£0.5m): the residual falls to £3.5m. The same £2.5m is now 71% of value; at 70% the loan falls to about £2.45m.
  • Add 10% contingency (£1.0m): the residual falls to £3.0m. £2.5m would be 83%; at 70% the loan falls to £2.1m, so £400k less.

The lesson: on a land loan, the cost plan is part of the security. Evidence it; don’t pad it.

Last reviewed: 18 October 2026

Who Is This For?

Ideal Borrower Profiles

Developers Ready to Build

You have identified a site with full planning and need to acquire it quickly before a competing developer. The land purchase is the first stage – development finance follows once you are ready to break ground.

Planning Gain Investors

Buying consented sites to sell to housebuilders or developers at a premium. The planning consent transforms the land value, and the margin between your acquisition cost and the sale price is the profit. We fund the purchase and hold period.

Housebuilders Securing Pipeline

Building a land bank of consented sites to ensure a steady pipeline of future projects. Short-term finance lets you secure sites opportunistically while maintaining cash flow for active builds elsewhere.

Developers with Outline Consent

Your site has outline planning permission with reserved matters still to be approved, or permission in principle (a separate route) with technical details consent still to come. We find lenders comfortable at this stage – funding the acquisition while you work through the remaining conditions.

Common Questions

Land with Planning FAQs

What LTV can I get on land with full planning?

Up to 70% of the consented land value, which reflects the planning consent. This is significantly higher than unplanned land because the consent materially increases the site’s market value. The valuation will be based on the consented use – for example, residential development land is valued on a residual basis considering the approved scheme.

Is outline planning treated differently to full planning?

Yes. Outline planning permission establishes the principle of development but leaves detailed matters – access, appearance, landscaping, layout, and scale – to be approved later as reserved matters. Permission in principle is a separate route, not another name for outline: it settles location, land use and amount of development first, and planning permission is only granted at the second stage, technical details consent. Lenders typically offer slightly lower LTVs on outline consent compared to full detailed permission, reflecting the residual uncertainty. However, many lenders are comfortable at this stage, particularly if the local authority has shown clear support.

How quickly can you complete on a land purchase?

Typically 5–7 working days, and faster in urgent cases. Land valuations can sometimes be expedited where the site is well-documented and the planning consent is clear. For auction purchases with a completion deadline, typically 20 business days, we routinely meet the timeframe. The key is getting us involved early — ideally before you exchange or bid.

What are the typical exit routes for land with planning?

The two main exits are: transitioning into a development finance facility to fund the build phase, or selling the consented site to another developer at the planning uplift value. Some borrowers also refinance onto longer-term land banking products if they plan to hold the site. We help you plan and arrange whichever exit works best for your strategy.

Does the type of planning consent matter?

Yes. Full detailed planning permission attracts the best LTVs and rates. Outline planning permission (or permission in principle, a separate route) is funded but at slightly lower leverage. Reserved matters applications pending can affect terms. The more progressed the consent, the better the funding terms.

What if the planning permission is about to expire?

Planning consent typically lasts 3 years from grant. If expiry is imminent, you may need to commence development to preserve it. Lenders check consent validity during due diligence. We factor expiry timelines into the facility term to ensure you have adequate time.

Can I sell consented land at a profit within the bridging term?

Yes. Planning gain — buying land, holding consent, and selling to a developer at the uplifted value — is one of the most profitable property strategies. The bridging facility covers the acquisition and hold period. Your exit is the sale at the planning uplift.

Why does my land valuation fall when I add contingency?

Because a land valuation works backwards from the finished scheme, every pound added to the build costs comes off the residual land value, pound for pound. A development lender likes contingency because it protects the build, but a land lender sees it as a lower land value, so evidence your costs rather than padding them (how the residual method works).

How does CIL affect the financing?

The Community Infrastructure Levy is payable when development commences, not when land is purchased. However, CIL liability reduces the residual land value and therefore the valuation for lending purposes. The surveyor factors CIL into the site appraisal.