Light & Heavy Refurbishment Finance

Refurbishment Bridging Loans

A refurbishment bridging loan funds the cost of buying and improving a property when speed matters more than the lender's tickbox. Whether you're flipping a tired terrace, converting a property to an HMO, or upgrading a buy-to-let between tenants, bridging gives you the cash to complete and renovate before refinancing or selling on.

Today’s rates and costs 158 lenders active in the market Every fee in writing before you commit
Discuss your deal Always confidential. No obligation.

£200k–£100m+

Loan Size

12 to 24 months

Typical Term

some lenders go to 36 months

Up to 75% LTV

Typical LTV

Key Features

What We Offer

Light & heavy refurbishment funded

Cosmetic upgrades through full structural overhauls, conversions and change-of-use schemes — we match the facility to the scope of works.

Purchase + works in one facility

Day-one advance funds the purchase up to LTV, works budget held in retention and released against the surveyor's progress reports.

Light refurb, typically 5–7 working days

No staged drawdown: funds are released in one tranche. Heavy refurb adds a few days for the staged structure.

Buy, refurbish, refinance (BRR)

Buy below market, renovate to uplift, refinance onto a long-term product at the improved value — extracting your capital.

Repaying early

Where there is an early repayment charge, it is usually three months' interest; very occasionally six; some loans have none.

1st and 2nd charge available

Need to keep the existing senior facility in place? We have lenders who take a clean second charge against the project.

Ideal For

Common Scenarios

Investors flipping for resale

Buy below market, refurb, sell at full value within 6–12 months. Light refurb deals typically complete in 5–7 working days.

Landlords adding to their portfolio

Buy a doer-upper, refurb to lettable standard, refinance onto a buy-to-let mortgage at the post-works valuation.

HMO converters

Buy a 3–4 bed house, convert to a 5–6 room HMO, refinance on the higher post-works valuation. Specialist lenders for HMO conversions.

Auction buyers

Properties bought at auction often need work to be mortgageable. Bridging covers both the purchase and the refurbishment in one facility.

Two Routes

Light vs Heavy Refurbishment

We split refurbishment bridging into two routes. The choice drives both the speed of completion and which lenders compete for your deal.

Light Refurbishment

Cosmetic and non-structural work. New kitchens, bathrooms, redecoration, flooring, light electrical. No planning permission, no building regs sign-off needed. Funds drawn in one tranche.

Bridging rates start from 0.50% a month (first charge, under 50% loan-to-value, straightforward cases) · typically 5–7 working days to complete

Heavy Refurbishment

Structural work, extensions, loft conversions, change of use, anything requiring planning consent or building regs. Funds drawn in stages against works completed.

Priced a step above light refurb · typically 5–7 working days, towards the upper end

Heavy Refurb In Detail

Heavy Refurbishment Finance

What counts as heavy refurbishment. Heavy refurb sits between cosmetic light-touch work and ground-up development. It typically involves one or more of: structural alteration (load-bearing walls, new openings, foundation work), change of use (commercial-to-resi, single-dwelling-to-HMO), planning permission required (loft conversion, side or rear extension, basement dig-out), or a gross development value (GDV) uplift of 15% or more on the post-works valuation. If any of those apply, the deal needs a heavy refurbishment facility rather than a light refurb bridge.

Why heavy refurb sits between bridging and development finance. Pure development finance is geared around build-cost drawdown against a clean planning permission and a programme of works. Standard bridging assumes the property is broadly mortgageable at funding day. Heavy refurbishment finance bridges that gap — the asset is being materially changed, so the lender underwrites both the day-one position (purchase + current value) and the end position (GDV after works), and structures drawdown around interim QS-validated progress. It's a hybrid product, and lender appetite varies sharply with the works profile.

LTV bands typically available. On day one, expect 70–75% of the current open-market value to fund the purchase. The works budget then sits on top, retained by the lender and released in tranches. Total exposure is capped on a loan-to-GDV basis — typically up to 70% LTGDV for clean cases, sometimes 75% with strong sponsor track record and conservative GDV. The implication: borrowers don't always need to fund the works budget from their own capital, but they do need to contribute the GDV gap.

Drawdown structure. Funds release in stages, validated by a Quantity Surveyor or monitoring surveyor instructed by the lender. Typical pattern: 30–40% on completion of demolition and strip-out; further tranches on first-fix electrics/plumbing, second-fix and plastering, kitchen/bathroom install, and final snag-and-completion. The QS visits site to confirm progress before each release. This adds 2–3 working days per drawdown but protects both lender and borrower from cost overrun spirals.

Typical timelines. Bridging terms are most commonly 12 to 24 months; some lenders go to 36 months. Heavy refurb schemes build in time for slippage; schemes that need longer than the bridge allows are usually edging toward needing development finance instead. Exit is normally either sale (flip) or refinance onto a buy-to-let or commercial-mortgage on the post-works valuation — our bridging calculator gives a quick scenario read; for a live scheme, arrange a call.

How It Works

From Application to Completion of Works

1

Application

Tell us about the property, the works, and your exit (sale or refinance). We do a soft credit footprint at this stage only — no hard search until you're ready to proceed.

2

Indicative terms

Within 4 hours on straightforward deals, often quicker, with indicative LTV and rate. Indicative terms are a guide, not an offer. Credit-backed terms are an offer from the lender, subject to its conditions.

3

Valuation

A RICS surveyor values both the current state ("market value") and the post-works value ("gross development value" or GDV). The valuation drives the maximum loan size.

4

Legals

Your solicitor and ours work in parallel. Straightforward cases typically complete in 5–7 working days, and light refurb without complications often closes at the quick end of that.

5

Drawdown & exit

Funds released to your solicitor on completion. For heavy refurb, the works budget is held back and released in tranches as the project progresses. You exit by refinancing or selling.

Loan Parameters

Headline Numbers

Loan size

£200k–£100m+

LTV

Typically up to 75% on day one; a few lenders will go higher with additional security. Works funded on top against GDV.

Term

12 to 24 months; some lenders go to 36 months

Rates

From 0.50% a month (light); heavy refurb prices a step higher

Charges

1st and 2nd charge available

ERCs

None after month 3

Common Questions

Refurbishment Bridging FAQ

Can I borrow for both the purchase and the refurbishment?

Yes. The day-one advance funds the purchase up to our LTV limit, and the works budget is held in retention and released against the surveyor's progress reports.

Do I need planning permission to apply?

Not for light refurbishment. For heavy refurbishment with planning, we expect permission to be granted before drawdown — though we can lend in principle on the basis that it's pending.

What if the works run over budget?

We build a 10–15% contingency into the works schedule. If the project genuinely overruns, we'd rather restructure the loan than let the project stall — talk to us early.

How fast can a refurbishment bridge complete?

Refurbishment bridges typically complete in 5–7 working days from application. Heavy refurb adds a few days for the staged drawdown structure to be agreed.

Can I exit by refinancing rather than selling?

Absolutely — most of our refurbishment clients refinance onto a buy-to-let or commercial mortgage on the post-works valuation. We can introduce you to refinance brokers if useful.

What is heavy refurbishment finance?

Heavy refurbishment finance is a short-term loan structured for property projects involving structural change, change of use, planning-permission works, or a gross development value uplift of 15% or more. It sits between standard bridging (where the property is already broadly mortgageable) and development finance (ground-up construction). Funds release in stages against QS-validated progress reports, with the works budget retained by the lender on day one.

How does heavy refurbishment funding differ from a standard bridging loan?

A standard bridge assumes the asset is mortgageable at funding day and lends against current open-market value. Heavy refurbishment funding underwrites both the day-one position and the post-works GDV, structures drawdown in stages tied to a QS report, and runs terms that allow for the works programme (terms are most commonly 12 to 24 months; some lenders go to 36 months). Pricing is typically 0.10–0.20% a month higher than a light refurb bridge to reflect the additional underwriting complexity.

What heavy refurbishment loan rates are available in 2026?

Heavy refurbishment rates start from 0.70% a month (under 50% loan-to-value, clean cases with a clear sale or refinance exit, as at 29 October 2026). Pricing widens with leverage, works complexity, and exit risk. Published heavy refurbishment rates across 12 lenders run from 0.70% (lowest) to 1.00% (highest) a month, as at 25 October 2026. Live rate movements across our 158 lenders are published on our rates page, updated every weekday.

Ready to Discuss Your Deal?

Get an indicative quote or arrange a call with a specialist. If we can respond immediately we will, otherwise we'll call you back the same working day, often within a couple of hours.